Project Overview
Package No. 30 under Phase II of the landmark Handri-Neeva Sujala Sravanthi (HNSS) Project. The scope encompassed extensive canal earthwork excavation, trapezoidal canal prism formation, engineered embankment compaction, and hydraulic cross-drainage structures for major inter-basin water conveyance.
Executed across demanding topography in the Madanapalle Circle, this package forms a critical reach in channeling drought-mitigating irrigation waters to agrarian communities across the Rayalaseema region.
Key Deliverables & Scope
- Heavy mechanized earthwork excavation for canal prism in soil and weathered rock
- Layer-compacted embankment formation with strict proctor density control
- Plain Cement Concrete (PCC) canal bed and side slope lining to curtail seepage
- Cross-drainage culverts, under-tunnels, and hydraulic drop structures
- Stone pitching and revetment bank protections ensuring designed hydraulic discharge
Engineering Highlights
| Parent Scheme | Handri-Neeva Sujala Sravanthi (HNSS) Phase II |
|---|---|
| Hydraulic Structure | Trapezoidal lined canal section with integrated cross-drainage |
| Lining & Stability | Cement concrete lining with geomembrane underlay & filter drains |
| Impact Scope | Inter-basin bulk water transport alleviating drought conditions |