Project Overview
Waste Stabilisation Pond work executed for the comprehensive underground drainage system in Tiptur City Municipal Council under Package No. TPT-1 (STP & wet well).
This critical civic sewage treatment project encompassed the construction of anaerobic and facultative stabilisation ponds, reinforced circular wet wells, influent pumping stations, and associated effluent management infrastructure, establishing reliable, environmentally compliant wastewater sanitation for Tiptur town.
Key Deliverables & Scope
- Complete sewage treatment plant with multi-cell Waste Stabilisation Ponds (WSP)
- Heavy RCC circular wet well construction and intermediate sewage pumping facilities
- Seamless integration with municipal underground drainage (UGD) collector networks
- Environmental compliance systems meeting Karnataka State Pollution Control Board guidelines
- On-site effluent testing, quality control, and discharge monitoring structures
Technical Specifications
| Treatment Technology | Biological Waste Stabilisation Ponds (Anaerobic & Facultative Cells) |
|---|---|
| Intake Structure | RCC Circular Wet Well & Screen Chamber Pumping Station |
| Network Integration | Integrated with Tiptur CMC Package TPT-1 UGD Trunk Mains |
| Environmental Mandate | KUIDFC Environmental & Social Management Framework (ESMF) |